• Actual language: english
  • switch to French

Country

United KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomPolandPolandBelgiumSwedenSwedenSwedenSwedenSwedenNetherlandsNetherlandsSloveniaTurkeyTurkeyPortugalPortugalPortugalPortugalPortugalGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainBulgariaItalyItalyItalyItalyItalyCzech RepublicSlovakiaGermanyGermanyGermanyGermanyAustriaFranceFranceFranceFranceFranceFranceFrance

Legend

 
smart
 
fair
 
improvable
 
troublesome
 
bad
Severe barrier

Database Help

PV FINANCING is a follow-up project of
PV Grid
Last update: 31.03.2017

National Contact Point: eclareon GmbH - Bente Klein
(pt3(at)eclareon.com)

Residential photovoltaic installations (maximum 10 kVA low voltage connected and yearly counting) are well developed in Wallonia, because of the fact that PV sysems of this size are exempt from the urban permit and they are easy to install. Until 2014, a support system through green certificates was in place. It was replaces by Qualiwatt which has been in ... (Unhide text)
 
Residential photovoltaics represents 87% of the installed PV capacity in Wallonia. Characterized by an average power of 5 kVA, it is mostly rooftop and sometimes on the ground (garden).
Check the urban permit exemption
Urban permit request
Analysis of the profitability of the PV system
Select a non equity financing offer
Contact one of the energy desks
Select an installer
Photovoltaic System Installation
PV system commissioning
Validation of the PV system and access to netmering system
Check phase configuration of electric grid
Access to the "Qualiwatt" premium.
Filing of the Qualiwatt application
Assessment of the application by the DSO
ABOVE 5 kVA: preliminary impact study
Confirmation of the Qualiwatt allocation by the DSO
Access to the net-metering scheme
Notification of production and sale of green certificates
Officialisation of a sales contract
Green certificates sale