• Actual language: english
  • switch to Greek

Country

United KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomPolandPolandBelgiumSwedenSwedenSwedenSwedenSwedenNetherlandsNetherlandsSloveniaTurkeyTurkeyPortugalPortugalPortugalPortugalPortugalGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainBulgariaItalyItalyItalyItalyItalyCzech RepublicSlovakiaGermanyGermanyGermanyGermanyAustriaFranceFranceFranceFranceFranceFranceFrance

Legend

 
smart
 
fair
 
improvable
 
troublesome
 
bad
Severe barrier

Database Help

PV FINANCING is a follow-up project of
PV Grid
Last update: 15.04.2017

National Contact Point: HELAPCO, eclareon GmbH - Stelios Psomas (HELAPCO), Georgios Maroulis (eclareon)
(spsomas(at)otenet.gr; gm(at)eclareon.com)

Since 1 July 2009 a programme has been in force for the installation of small PV systems (<10 kW) in the residential sector. In September 2010, the programme was extended to cover all regions, and authorisation procedures have been further simplified. Most barriers have now been lifted for this segment. ... (Unhide text)
 
The authorities involved are the local branch of the DIstribution Network Operator (HEDNO), which issues a grid-connection offer and the Public Power Corporation (PPC) (or any other electricity retailer) with which a "net-metering a agreement is being signed.
Examination of criteria for installation site
Application for grid connection to the local branch of the Distribution Network Operator
Filing of an application for drawing up of a Connection Agreement
Signing of the Connection Agreement
Application for drawing up a "Net Metering Agreement"
Signing of the "Net Metering Agreement"
Funding of project
Choice of provider-installer
Construction
Application for activation of connection
Activation of the connection
Net Metering process
Legal obligations during system operation