United KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomUnited KingdomPolandPolandBelgiumSwedenSwedenSwedenSwedenSwedenNetherlandsNetherlandsSloveniaTurkeyTurkeyPortugalPortugalPortugalPortugalPortugalGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceGreeceSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainSpainBulgariaItalyItalyItalyItalyItalyCzech RepublicSlovakiaGermanyGermanyGermanyGermanyAustriaFranceFranceFranceFranceFranceFranceFrance

Legend

 
smart
 
fair
 
improvable
 
troublesome
 
bad
Severe barrier

Database Help

PV FINANCING is a follow-up project of
PV Grid
Last update: 05.04.2017

National Contact Point: eclareon - Boris Valach
(pt5(at)eclareon.com)

From December 2013, the entire Slovak RES sector has been facing the so-called freeze status for plants above 10 kWp because of the stop in the license issuing from regional distribution system operators (DSOs). Not taking into account the mentioned connection moratorium, the support in the form of FiT for rooftop and facade PV systems is applicable ... (Unhide text)
 
In this segment, PV systems are usually up to 2,5 kWp of installed capacity and the electricity generated by such a source is intended solely for the consumption point of delivery.
Verification of requirements
Reservation of grid capacity
Obtention of a connection agreement
Application for a building permit
Provision of documents on the design of the PV installation
Submission of the authorisation to the DSO
File a notice of connection
Apply for the "Zelená domácnostiam" support programme
Work safety
Electric connection
Announcement of connection
Certified installer
Connection procedure
Green to Households (Zelená domácnostiam)